Tianhe directional well product practical case
The high-speed and high-power screw drilling tools manufactured by TRW Petroleum Company have been widely used in domestic oil fields. The depth of one run is 1821-2171 meters, the cumulative footage is 350 meters, the pure drilling time is 50.3 hours, and the average ROP is 7 meters/hour. The second well entry depth is 2171-2722, the cumulative footage is 551 meters, the pure drilling time is 76 hours, and the average ROP is 7.2 meters/hour. The third well entry depth is 527-1702 meters, the cumulative footage is 1,175 meters, the pure drilling time is 89 hours, and the average ROP is 13.2/ hour. The drilling was completed in the ramping section and part of the ramping section. The depth was 1702-2727 meters, the cumulative footage was 1025 meters, the pure drilling time was 182 hours, and the average ROP was 5.6/ hour.

Related News
Join Tianhe Oil at Xinjiang Petroleum & Chemical Expo 2026 2026-06-29 0
What value does the Multi-Activation Bypass Valve deliver? 2026-06-17 0
How does a multi-activation bypass valve work? 2026-06-11 0
Multi-Activation Bypass Valve Industry Pain Points & Core Functionality 2026-06-05 0
An In-Depth Breakdown of Cased-Hole Sidetracking: Racing Through the Steel Wall 2026-05-28 0
Downhole "Surgery": How Casing Side-Tracking Breathes New Life into Damaged Wells 2026-04-30 0
New application example of high speed and high power screw drilling tool of TRW Petroleum 2022-11-04 384
The company passed the review of QES system certification 2022-08-09 452
In 2021, the first batch of high-tech enterprises were approved 2022-08-09 516
API external audit 2022-08-09 585